top_en
 
 
4001102713
leftup
Company Profile
Business
Organizational
Home > Company News
 
The Second Production Line of 25 Megawatts Entered into Production
  [date] 08-11-11 [times] 4546 [Print] [Close] [Collection ]  

The second production line of 25 Megawatts solar cell had been put into production on August 2nd  2008, which shows that the production capacity of Wuxi Shangpin Solar Energy Science & Technology Co., LTD has reached a new stage.

Based on the experience of our first production line of solar cell, the installation and commissioning of this second production line of 25 Megawatts solar cell were completed successfully on July 31st 2008. All the equipments & machines of the line are now operating and entering into production smoothly. The solar cells manufactured within this production line can achieve the efficiency of 16.8% or higher, which are the high quality materials of solar modules.

Warmly welcome to Wuxi Shangpin Solar Energy Science & Technology Co., LTD.

     
 
 
leftdown
foot02
------ Set home ------ Favorite ------ About us ------ Site management ------
You are browsing the site visitor
CopyRight 2005~2011 wxsunpower.com All Rights Reserved
  苏ICP字001555022号